In Progress Skirting
Site
Last Updated
51- country club drive- country club
03/03/2022
27 birch- country club
02/14/2022
331h
02/04/2022
349o
02/07/2022
411se
02/04/2022
409se
02/04/2022
499se
02/04/2022
1109t
02/04/2022
1095t
02/04/2022
736br
02/04/2022
05f
02/09/2022
878v
02/09/2022
3375 onyx
02/09/2022
3413 onyx
02/09/2022
3515 onyx
02/14/2022
3429 onyx
02/14/2022
3523 skirting
02/14/2022
Skirting Site
In Progress Skirtings
Next
* Data is Autosaved
*Upon submission, the data would not be displayed under the "In Progress" tab
Checklist
All piers are in place and properly installed and no threads showing over 2" from top of the nut
No voids under ABS pads/ No ABS pads are deflected more than 3/8'
Anchors installed properly if applicable
Straps are wrapped 4-5 times around split bolt and installed properly on frame
Xi2 system hardware installed correctly and not loose
Concrete is backfilled with stone
Dryer vent installed
Vents installed
Shingles are laid for weed barrier with plastic tucked underneath
Access panels are at the water shut off and sewer cleanout
Trim is complete around utilities and hose bibb
Garbage is removed from around the site
All materials are removed from home