In Progress Skirting
Site
Last Updated
sterling 422
12/28/2022
sterling 342 oak
12/29/2022
Lincoln park 845
01/03/2023
sterling 416
01/03/2023
47 back acres
01/05/2023
47 back acres
01/05/2023
485 sterling
01/06/2023
331 sterling
01/10/2023
485 sterling east
01/10/2023
50 whipple tree
01/11/2023
850 sterling
01/19/2023
188 whipple
02/07/2023
323 whipple
02/07/2023
243 whipple
02/07/2023
251
02/10/2023
243 whipple
02/14/2023
108 whipple tree
02/14/2023
100 whipple
02/15/2023
75 country elm
03/06/2023
100 country elm
03/06/2023
16 wheeling
04/20/2023
Skirting Site
In Progress Skirtings
Next
* Data is Autosaved
*Upon submission, the data would not be displayed under the "In Progress" tab
Checklist
All piers are in place and properly installed and no threads showing over 2" from top of the nut
No voids under ABS pads/ No ABS pads are deflected more than 3/8'
Anchors installed properly if applicable
Straps are wrapped 4-5 times around split bolt and installed properly on frame
Xi2 system hardware installed correctly and not loose
Concrete is backfilled with stone
Dryer vent installed
Vents installed
Shingles are laid for weed barrier with plastic tucked underneath
Access panels are at the water shut off and sewer cleanout
Trim is complete around utilities and hose bibb
Garbage is removed from around the site
All materials are removed from home
Water Heater Blow off exiting skirting with 90 Degree elbow facing downward.
Comments
Write your comments
Images
Upload Images
Crew leader:
Date:
Submit