Longo Corporation
Facilities Management Services
Innovation
Direction
Solutions
About Us
Services
Customer Portal
Checklist
Homesite
Skirting
Contact Us
Follow us:
In Progress Homesite
Site
Last Updated
720 br
02/09/2022
404se
02/09/2022
402se
02/09/2022
256pi
02/09/2022
623 sw
02/09/2022
418 se
02/09/2022
422 se
02/09/2022
420 se
02/09/2022
202 pi
02/09/2022
416se
02/09/2022
241 pi
02/09/2022
342o
02/09/2022
5 ceader
02/10/2022
5 cedar- country club
02/14/2022
5 fir
02/15/2022
1095
03/01/2022
838 v
02/24/2022
411
02/24/2022
286 walnut
02/25/2022
1095t
03/03/2022
willow
03/08/2022
Home Site
In Progress Homesites
Next
* Data is Autosaved
*Upon submission, the data would not be displayed under the "In Progress" tab
Checklist
Foundation meets minimum HUD and manufacturer installation manual criteria
Material in home removed & skirting is laid down
Home is positioned properly on pad
Piers laid out per manual and correct loading info, no broken blocks
Cribbing Setup Properly
Leveled to less than 1/4" of variance across all piers
Floor, roof and wall fastening complete per installation manual instructions
Roof has been inspected / repaired from shipping holes and any damage
Furnace cap has been installed
PVC drain lines have been connected to sewer with 1/4" / ft slope and cleanout
Furnace condensation drain line run to exterior of skirting w/screen
Dryer vent has been vented outside of skirt and supported
Ground anchor system has been completed and properly tensioned per installation manual
Marriage line piers installed as needed (openings 4ft or greater)
Skirting, siding soffit and fascia compete on ends if applicable
Exterior coach lights installed with bulb
Complete detailed fit and finish inspection of interior and exterior for damage and correct as needed
Dryer Vented through skirting properly per installation manual
Ship lose materials removed and light bulbs installed
Mate line doors and trim complete (double wide only)
Exterior door adjustments are complete and acceptable.
Gas, water, grounding and HVAC crossovers complete (double wide homes only)
Shipping materials have been removed and placed in receptacle
Exterior of home is clean including removal of all extra materials
Rough clean complete including removal of shipping materials
Submit any defects including parts needed to complete to the manufacturer.